Off-grid and hybrid microgrid systems built on in-house PCS, STS, DC/DC and EMS — engineered to run where reliability is not optional.
Power electronics designed and manufactured in-house, from DC/DC converters to full hybrid cabinets.

125 kW all-SiC PCS · 600–950 Vdc battery · 98.8% peak efficiency

5 kW isolated DC/DC · 200–420 Vdc bus · 32 units in parallel

125 kW bidirectional DC/DC · 600–1500 V · up to 40 units in parallel

20 kW non-isolated DC/DC · 260–900 Vdc · MPPT 260–720 Vdc

60 kW MPPT · 200–850 V tracking · 4 independent channels

400 kVA STS · 0 ms active transfer · 20 ms passive transfer
We size, engineer and deliver the full system — not just the box. Every project starts with your load profile.
Discuss Your Project
Island and remote-area power with PV + BESS + diesel, engineered for high renewable penetration and low diesel dependence.
Learn more →PV + storage + diesel systems for weak-grid sites, with seamless source switching and intelligent EMS dispatch.
Learn more →Peak shaving, demand-charge reduction and backup power for factories and facilities.
Learn more →Charging-plus-storage integration for bus depots and transit hubs, with grid-friendly load management.
Learn more →System, microgrid or full delivery — the same engineering team from site assessment to operation.
Storage cabinets, PCS and EMS specified as one system — DC bus, switchgear and control logic engineered together, then handed over with documentation your own engineers can maintain.
Explore System Integration →PV, storage and diesel dispatched by a single EMS for weak-grid and off-grid sites, where fuel logistics and load stability decide the economics.
Explore Microgrid Solutions →Factory testing, export documentation and commissioning handled by the team that designed the system — with remote diagnostics and spare parts after handover.
Explore Delivery & Service →From island microgrids to remote industrial sites — the same architecture, proven in the field.
They integrated the storage cabinets with our existing PV and genset controls without forcing a controls overhaul. The DC bus and EMS logic were documented clearly enough for our own engineers to maintain after handover. Commissioning ran longer than the original schedule, but the handover package was complete.
The island system holds 99.3% availability and diesel runtime has dropped sharply since commissioning. The load-shedding strategy protects critical feeders without manual intervention, which is what we could not get from the previous supplier. Remote diagnostics are strong; local spare-part logistics are the part we still plan around.
Ten units shipped to four sites inside one schedule window. Test reports, CE files and wiring documentation arrived with the hardware rather than weeks later. Customisation requests move slower than they would with a local integrator — but nothing shipped wrong.
PDF, in English — the same documents we hand to EPCs at tender stage.
Tell us your load profile and site conditions — our engineers will size the right system.
Tell us about your project — our engineers respond within one business day.