Microgrid & Energy Storage · Engineered in Shenzhen
Projects

Systems running where the grid is thin.

Commissioned projects, described by the constraint that shaped them — fuel logistics, grid reliability, load profile — and the numbers we measured afterwards.

1.5 MW / 3.15 MWh
Africa · Commercial Storage Fleet, 10 × 150 kW / 315 kWh
Ten cabinets on one deployment — 1.5 MW / 3.15 MWh across multiple commercial sites.
C&IPeak shavingCabinet fleet
500 kW PV · 1 MWh BESS
Europe · Farm PV and Storage, 500 kW / 1 MWh
500 kW of PV with a 1 MWh battery and a 400 kW PCS behind a constrained grid connection.
AgricultureSelf-consumptionWeak grid
2 MW PV · 4 MWh BESS
Southeast Asia · Island Microgrid, 2 MW / 4 MWh
Diesel consumption cut 72%, payback in 4.2 years, 99.3% measured availability.
Island / off-gridPV + BESS + DieselDiesel −72%