Microgrid & Energy Storage · Engineered in Shenzhen
Solution

PV + Storage + Diesel Hybrid for Commercial Sites

One cabinet holds the PCS, MPPT, EMS and transfer switch — grid-tied, with the diesel absorbed into the control logic.

C&IPV + BESS + Genset0 ms transfer
250 kVA – 1.5 MVATypical scale

A factory with a roof full of PV, a diesel backup set and a grid connection usually ends up with three systems that do not talk to each other. The PV inverter exports when it should be charging, the diesel starts on a timer rather than on need, and nobody knows which source is cheaper at 14:00 on a Tuesday.

Why one cabinet instead of three boxes

When the PCS, the MPPT and the transfer switch are designed as one unit, the transfer decision is made by the same controller that knows the battery state. There is no negotiation over a Modbus link between three vendors, and no scenario where the PCS is exporting to the grid while the diesel is running to charge the battery. The MSP series packs all of it into a single 1350 × 2200 × 850 mm enclosure.

The control logic that matters

  • Anti-backflow caps export at the interconnection limit instead of tripping the main breaker
  • Peak shaving charges from PV at midday and discharges into the afternoon peak, so the demand charge falls without cycling the battery twice
  • Genset hybrid keeps the diesel at a healthy load and puts surplus into the battery rather than into heat
  • SOC balancing across parallel cabinets stops one bank from carrying the others

What it looks like on site

Three cabinets parallel to 1.5 MVA. Each cabinet carries 500 kVA continuous and 550 kVA peak, tolerates 100% load unbalance on the off-grid output, and rides a 1.25 × overload for 300 ms — enough to start a large motor without dropping the rest of the plant. The 800 A bypass allows maintenance without shutting the site down.

System outline

What goes on site.

Integrated cabinet
ModelMSP250HCG2 / MSP375HCG2 / MSP500HCG2
ContentsPCS, 4 × MPPT, EMS, PCM transfer switch, AC/DC distribution
ParallelUp to 3 cabinets, 1.5 MVA maximum
Grid transferActive 0 ms, passive <10 ms
PV input
Voltage window200–950 V open circuit
MPPT range600–900 V
Power per channel120 kW × 4
Battery
Voltage range680–900 V nominal, 950 V maximum
Load behaviour
Overload1.1 × for 100 s, 1.25 × for 300 ms
Unbalance tolerance100% on the off-grid output
Efficiency>99.3% system level
Related

Other architectures

200 kW – 2 MW
Off-Grid Microgrid for Islands and Remote Sites
PV, battery and diesel on one AC bus — 72% less diesel on our 2 MW / 4 MWh reference site.
105 kW – 250 kW · 241 – 522 kWh
Containerised C&I Storage for Peak Shaving
Liquid-cooled cabinets from 105 kW / 241 kWh, paralleled to 250 kW / 522 kWh for demand-charge reduction.