Containerised C&I Storage for Peak Shaving

Liquid-cooled cabinets from 105 kW / 241 kWh, paralleled to 250 kW / 522 kWh for demand-charge reduction.

Peak shavingLiquid cooledDemand charge
105 kW – 250 kW · 241 – 522 kWhTypical scale

Most commercial storage projects are sold on arbitrage and justified on demand charges. The arbitrage spread moves with the market; the demand charge does not. A cabinet sized to clip the monthly peak — not to shift every kWh — pays back faster and cycles less.

Sizing to the peak, not the bill

A 250 kW / 522 kWh cabinet discharges 250 kW for two hours, which covers the typical afternoon peak of a mid-size industrial site. Where the peak is shorter but deeper, the same cabinet delivers 1.25 × for 300 ms and holds 1.1 × for 100 s, which is what actually prevents the demand spike when a compressor starts.

Why liquid cooling at this size

Air-cooled cabinets derate on a 40 °C roof. Liquid cooling holds the cells within a narrow band, which keeps the charge and discharge rates available in July at the same level as in January, and slows the calendar ageing that shows up as capacity loss in year four. The trade is a more complex service procedure — the cooling loop needs a planned check, not a filter change.

What the EMS has to do

  • Track the rolling demand window and discharge before the ceiling is crossed, not after
  • Recharge outside the peak without creating a new one
  • Reserve a floor of SOC for outage backup if the site treats the battery as a UPS
  • Report per-string state of health so a weak module is replaced before it limits the cabinet

We have delivered 999+ systems across commercial, industrial and utility sites, including ten 150 kW / 315 kWh cabinets on a single South African deployment.

System outline

What goes on site.

Cabinet
Configuration105 kW / 241 kWh · 125 kW / 261 kWh · 250 kW / 261 kWh · 250 kW / 522 kWh
Cell chemistryLiFePO4
CoolingLiquid cooled
InstallationOutdoor cabinet, 0.4 kV low-voltage connection
Conversion
PCSIntegrated bidirectional, 125 kW class, 600–950 Vdc battery window
Efficiency98.8% charge / 98.5% discharge at module level
Control
DispatchTime-of-use schedules, demand-charge ceiling, PV self-consumption
SafetyMulti-level BMS protection, cell-level monitoring, aerosol fire suppression
Related

Other architectures

200 kW – 2 MW
Off-Grid Microgrid for Islands and Remote Sites
PV, battery and diesel on one AC bus — 72% less diesel on our 2 MW / 4 MWh reference site.
250 kVA – 1.5 MVA
PV + Storage + Diesel Hybrid for Commercial Sites
One cabinet holds the PCS, MPPT, EMS and transfer switch — grid-tied, with the diesel absorbed into the control logic.