Africa · Commercial Storage Fleet, 10 × 150 kW / 315 kWh

Ten cabinets on one deployment — 1.5 MW / 3.15 MWh across multiple commercial sites.

C&IPeak shavingCabinet fleet
1.5 MW / 3.15 MWhTypical scale

Ten identical cabinets across ten commercial sites is a different engineering problem from one large system. The hardware is the same; the difficulty is that every site has its own load shape, its own tariff window, and its own tolerance for a battery taking up floor space.

Why a standard cabinet instead of a bespoke build

A 150 kW / 315 kWh cabinet covers the afternoon peak of most of these sites with margin, and it arrives tested rather than assembled on site. Ten identical units also mean one spare parts list and one maintenance procedure for the whole fleet.

What the EMS has to handle

The dispatch logic is per site: track the rolling demand window and discharge before the ceiling is crossed, then recharge outside the peak without creating a new one. Where a site treats the battery as backup, a floor on state of charge is reserved and the peak-shaving algorithm works above it.

Project scope

What was installed.

Deployment
Units10 × 150 kW / 315 kWh cabinets
Total1.5 MW / 3.15 MWh
ConfigurationCabinet-level PCS, parallel operation where required
Duty
PrimaryDemand-charge reduction per site
SecondaryReserve state of charge held for outage support
Environment
CoolingLiquid-cooled cabinets
InstallationOutdoor, 0.4 kV connection
Related

Other projects

2 MW PV · 4 MWh BESS
Southeast Asia · Island Microgrid, 2 MW / 4 MWh
Diesel consumption cut 72%, payback in 4.2 years, 99.3% measured availability.
500 kW PV · 1 MWh BESS
Europe · Farm PV and Storage, 500 kW / 1 MWh
500 kW of PV with a 1 MWh battery and a 400 kW PCS behind a constrained grid connection.