Europe · Farm PV and Storage, 500 kW / 1 MWh

500 kW of PV with a 1 MWh battery and a 400 kW PCS behind a constrained grid connection.

AgricultureSelf-consumptionWeak grid
500 kW PV · 1 MWh BESSTypical scale

A farm with a capped grid connection and a midday load curve looks like an easy storage case. It is not: the pumps and the cold store both draw hardest in the middle of the day, exactly when the array is producing. Without storage, the surplus is curtailed and the evening peak is bought back from the grid.

What we built

500 kW of PV, a 1 MWh battery and a 400 kW bidirectional PCS, with MPPT on the DC side and an EMS that holds export at the interconnection limit instead of tripping it. The battery absorbs what the array produces above the site load, then returns it after sunset when irrigation restarts.

Why the PCS is oversized against the array

The inverter is rated for the discharge duty, not the array. Evening irrigation pulls harder than midday production, and a PCS matched to 500 kW of PV would have capped that discharge. The 400 kW unit covers the evening load while the battery still holds reserve for a grid outage.

Project scope

What was installed.

Site
LocationEurope, rural farm
GridLimited import capacity at the point of connection
LoadIrrigation pumps and cold storage, both peaking midday
ConstraintExport capped; midday production had nowhere to go
Installed
PV500 kW
Storage1,000 kWh
Conversion400 kW bidirectional PCS + MPPT
ControlSelf-consumption with export limit and peak clipping
Duty
PrimaryStore midday PV for evening irrigation and cooling
SecondaryClip import peaks above the contracted demand
Related

Other projects

2 MW PV · 4 MWh BESS
Southeast Asia · Island Microgrid, 2 MW / 4 MWh
Diesel consumption cut 72%, payback in 4.2 years, 99.3% measured availability.
1.5 MW / 3.15 MWh
Africa · Commercial Storage Fleet, 10 × 150 kW / 315 kWh
Ten cabinets on one deployment — 1.5 MW / 3.15 MWh across multiple commercial sites.