Microgrid & Energy Storage · Engineered in Shenzhen
Project

Southeast Asia · Island Microgrid, 2 MW / 4 MWh

Diesel consumption cut 72%, payback in 4.2 years, 99.3% measured availability.

Island / off-gridPV + BESS + DieselDiesel −72%
2 MW PV · 4 MWh BESSTypical scale

The island ran on diesel alone. Fuel came in by boat, the gensets ran at a low load factor most of the day, and the cost per kWh was set by shipping logistics rather than by generation. Solar had been tried before and failed — the array was oversized against a battery that could not absorb midday production.

The constraint

Sizing this system on daily energy would have produced a battery too small for the evening. The night load was 2.5 MWh against a 4 MWh daily total, so the battery was sized to the night and the PV was sized to recharge it before noon. The genset stayed in the design — removing it entirely would have doubled the battery and destroyed the payback.

What we built

PV feeds a common DC bus through MPPT modules, storage sits on the same bus through DC/DC converters, and a bidirectional PCS couples the bus to the island network. An STS provides 0 ms active transfer for the critical feeder. The EMS decides when the diesel runs: above a state-of-charge floor it stops entirely.

Result

Diesel consumption fell 72%. Levelised cost moved from $0.42 to $0.21 per kWh, measured availability reached 99.3%, and the system paid back in 4.2 years. The genset was not removed — it was demoted from prime power to backup, which is what made the economics work.

Project scope

What was installed.

Site
LocationSoutheast Asia, islanded network
LoadCommunity and commercial loads on one island grid
ConstraintFuel arrives by sea; gensets run at poor load factor
Installed
PVDC-coupled through MPPT modules
Storage4 MWh LiFePO4 across parallel banks
ConversionBidirectional PCS on a common DC bus
TransferSTS with 0 ms active transfer
ControlEMS with genset start/stop and load shedding
Result
Diesel consumption−72% against the pre-project baseline
Cost of energy$0.42 → $0.21 per kWh
Availability99.3% measured uptime
Payback4.2 years at local fuel prices
CO₂ avoided≈1,052 t per year
Related

Other projects

500 kW PV · 1 MWh BESS
Europe · Farm PV and Storage, 500 kW / 1 MWh
500 kW of PV with a 1 MWh battery and a 400 kW PCS behind a constrained grid connection.
1.5 MW / 3.15 MWh
Africa · Commercial Storage Fleet, 10 × 150 kW / 315 kWh
Ten cabinets on one deployment — 1.5 MW / 3.15 MWh across multiple commercial sites.